TOKYO - Mitsui O.S.K. Lines, Ltd. (MOL, President: Akimitsu Ashida) today
announced the launch of one of the worldfs largest iron ore carriers,
the 320,000 dwt Tubarao Maru. The naming and delivery ceremony was held today at the Mitsui Engineering
& Shipbuilding Co., Ltd. (MES) Chiba Works. The new vessel will sail
under a long-term transport contract with Nippon Steel Corporation.
The Tubarao Maru is similar to the worldfs largest iron ore carrier, the Brasil Maru, which was launched in December 2007. It is the second generation ship
to bear the name; the original Tubarao Maru was launched in 1966.
Guests at the ceremony included Nippon Steel President Shoji Muneoka and MES President Yasuhiko Katoh. President Muneokafs wife Yoko cut the rope and President Muneoka named the ship.
After the naming and rope-cutting ceremonies, the Tubarao Maru will go into service to transport Brazilian iron ore to Japan.
MOL became the first Japanese shipping company to operate a 300,000 dwt
class very large iron ore carrier(VLOC) with the launch of the Brasil Maru in December 2007. Five of these VLOCs will sail under the MOL operating
by August 2009.
Outline of Tubarao Maru
Length: 340m
Width: 60m
Draft: 21.13m
Deadweight tonnage: 327,127 tons
Shipbuilder: Mitsui Engineering & Shipbuilding Co., Ltd.
Outline of Contract
Contract: Contract of Affreightment(C.O.A.)
Cargo: Iron ore in bulk
Loading: Main iron ore ports in Brazil (Tubarao, Bonta De Madila)
Unloading: Nippon Steel Corporation major mills (Oita, Kimitsu, etc.)
Annual transport volume: About 1.4 million tons
E Reference
[First generation Tubarao Maru]
Ore carrier and tanker, delivered on July 15, 1966, 55,605 dwt
Japanfs first ore and oil combined carrier. It transported crude oil from the Persian Gulf to Brazil on outward voyages, and carried iron ore from Brazil to Japan on inward voyages.
|